Kokkinos ATEE Pindos AE APE SA
The main purpose of the company is the production of electric power through the development of the renewable energy resources.
Currently, there are two Small Hydro Power Plants under construction, whose total power is 4.24MW. In addition, the total power of projects under licencing procedures is 18.71MW, of which 17.36MW have Power Production Licences.
In total the projects are shown in the following table: