Activities
The activities of the group are covering all the stages, which are necessary to develop and operate renewable energy projects. Specifically these include:
- flow measurements for hydro power potential estimation
- wind mast installation and wind measurements for wind potential estimation
- renewable energy studies
- renewable energy studies
- environmental impact assessment studies
- design of Renewable Energy Sources (RES) projects
- supervision of construction works of RES projects
- operation of RES projects and maintenance of RES projects
Today the Group:
- operates 3 SHPP with a total power of 6,6 MW and two photovoltaic parks with a total power of 867 KW
- constructs one PV project of 821,1 KW total power
- develops several RES projects: 15.13 MW of small hydro and 90.85 MW of wind parks
- evaluates new locations, that may have potential for RES projects
- evaluates energy investments in Greece
- evaluates energy investments in the Balkans in general
To achieve its objectives, the group has a wide network of specialist partners in Greece and Europe.
Projects in Operation
Projects under construction
Projects in process
Group’s projects in process are displayed in the following table, assorted by technology:
Technology | Power (MW)
Hydroelectricity | 24,8
Aeolian | 90,85
Photovoltaic | 5
Total | 120,65