Activities

The activities of the group are covering all the stages, which are necessary to develop and operate renewable energy projects. Specifically these include:

  • flow measurements for hydro power potential estimation
  • wind mast installation and wind measurements for wind potential estimation
  • renewable energy studies
  • renewable energy studies
  • environmental impact assessment studies
  • design of Renewable Energy Sources (RES) projects
  • supervision of construction works of RES projects
  • operation of RES projects and maintenance of RES projects

Today the Group:

  • operates 3 SHPP with a total power of 6.6 MW and six photovoltaic parks with a total power of 2867 KW
  • constructs two SHPP projects of 4.24 MW total power
  • develops several RES projects: 19.24 MW of small hydro and 27.9 MW of wind parks
  • evaluates new locations, that may have potential for RES projects
  • evaluates energy investments in Greece
  • evaluates energy investments in the Balkans in general

To achieve its objectives, the group has a wide network of specialist partners in Greece and Europe.

Projects in Operation

 

Projects under construction

 

Projects in process

Group’s projects in process are displayed in the following table, assorted by technology:

 

Technology
Hydroelectricity
Aeolian
Photovoltaic
Total
Power (MW)
24,8

27,9

5
120,65

Technology | Power (MW)

Hydroelectricity | 24,8

Aeolian | 27,9

Photovoltaic | 5

Total | 120,65